Antalya-Alanya Motorway 35% Complete: Trip to Drop From 2.5 Hours to 36 Minutes
Minister Uraloğlu said physical progress on the Antalya-Alanya Motorway has reached 35%. Once finished, the trip between the two cities will take 36 minutes.
· 2 min read

Transport and Infrastructure Minister Abdulkadir Uraloğlu announced that overall physical progress on the Antalya-Alanya Motorway Project, which is under construction, has reached 35%. The minister said that once the motorway is complete, the journey that takes 2.5 hours on the current route will fall to 36 minutes.
Uraloğlu said the road, which will meet growing transport demand between Antalya and Alanya, will strengthen the region's transport infrastructure. Stressing its great importance for tourism, he said domestic and foreign tourists will reach the region faster and more comfortably once it opens.
Route and technical details
The motorway will start at the Serik Interchange and end at the Alanya West Interchange, north of Konaklı. The main body is planned with three lanes in each direction, while the connecting roads have a total of 4 lanes in the outbound and inbound directions. The project involves building a 122-kilometer route in total, made up of 84 kilometers of main body and 38 kilometers of connecting roads.
The route has 7 interchanges: Serik, Taşağıl, Manavgat, Manavgat East, Alarahan, Konaklı and Alanya West. The motorway has 5 tunnels and 16 viaducts.
Where is work under way?
Uraloğlu said excavation support work has been completed in 3 tunnels, where final concrete work continues. Excavation support work is continuing in the other 2 tunnels. Work is under way on 15 of the 16 viaducts.
The minister also said construction continues on 17 underpasses, 10 overpasses, 7 bridges and 48 culverts.
Economic gains
Uraloğlu said the motorway will bring total annual savings of 23.9 billion lira, of which 23 billion lira comes from time and 900 million lira from fuel. He added that carbon emissions will also fall annually once it is completed.
Once the Antalya-Alanya Motorway is completed, the 2.5-hour travel time on the current route will drop to 36 minutes.
Abdulkadir Uraloğlu
Agenda guides
- How to get your SGK service record statementYou can get your SGK service record statement through e-Devlet or by applying in person with ID at an office of the Social Security Institution. It shows your premium days and employment records.
- How is severance pay (kıdem tazminatı) calculated in Turkey?Severance pay is calculated as one month of gross "dressed" salary for each full year of service; partial years are prorated by days. The cap changes each period, so check the current figure from an official source.
- What is notice pay and how long are the notice periods in Türkiye?Notice pay is compensation, equal to wages for the notice period, paid by a party who ends an open-ended employment contract without observing the notice period. The periods are 2, 4, 6 and 8 weeks.





Comments
Sign in to comment.