Skip to content
Bora Haber
Markets
  • US dollar50.44up 0.05%
  • Euro55.34down 0.18%
  • British pound66.55down 0.11%
  • BIST 10011,477down 3.08%
  • Gold (gram)6,043down 3.53%
  • Gold (ounce)US$3,726down 3.58%
  • BitcoinUS$62,702down 1.5%
BREAKING

NASA Picks Eight Companies for Its Moon Base Program

In the new phase of its effort to build a permanent base at the Moon's south pole, NASA selected eight companies for CLPS 2. The nuclear-powered PROMISE rover and new transport missions were also announced.

Arda Sinyal

· 3 min read

The Moon, partly lit and covered in craters, set against the black background of space.
Illustrative view of the Moon, the focus of lunar base programs like NASA's. Temsili görsel · Fotoğraf: ViCky SiNgh / Pexels

NASA announced new contracts and mission plans in its effort to build a permanent base at the Moon's south pole. Eight companies, including SpaceX, Blue Origin and Lockheed Martin, were selected for a new lunar delivery program with a total ceiling of $10 billion.

The announcement was made on November 7, 2026, at the MAX POWER aerospace event at Kennedy Space Center in Florida, as part of the new phase of the Moon Base program. The work announced ranges from delivering scientific equipment and infrastructure materials to the lunar south pole to nuclear-powered exploration vehicles. Decisions were also made on sending new communications satellites and building power infrastructure on the lunar surface.

CLPS 2 and the scope of the contracts

One of the largest parts of the program is the second phase of the Commercial Lunar Payload Services (CLPS) initiative. Blue Origin, Firefly Aerospace, Intuitive Machines, ispace US, Lockheed Martin Space, Northrop Grumman Space Systems, SpaceX and Voyager Technologies were selected for CLPS 2. The companies will compete for future NASA missions to deliver cargo to the lunar surface.

The contract framework covers a 10-year period. The $10 billion figure is a ceiling, not a payment distributed directly to the eight companies; NASA will be able to buy services from the selected companies for the missions it needs. The companies will be responsible for developing, building and operating the spacecraft that land scientific instruments, technology equipment and base infrastructure on the lunar surface.

NASA also raised the contract ceiling of the existing CLPS 1.0 program from $2.6 billion to $4.2 billion. Existing contracts covering first-phase Moon Base missions will remain in force until November 2028, with an additional five-year period extending to November 2033 to complete the assigned missions.

The nuclear-powered PROMISE rover

Another key part of the new program is PROMISE (Polar Rover for Observation, Mapping, and In-Situ Exploration), a nuclear-powered lunar rover. The six-wheeled vehicle will study surface and subsurface conditions at the south pole and will be used to identify landing sites for future crewed missions and to investigate natural resources in the region.

NASA's Jet Propulsion Laboratory (JPL) will be responsible for developing PROMISE. The vehicle will be built by combining flight-ready spare parts left over from the Curiosity and Perseverance rovers on Mars with components from engineering test models. Using existing hardware and software infrastructure will shorten development and testing. Thanks to its nuclear power system, the rover will be able to operate during the long lunar nights and in permanently shadowed regions that sunlight does not reach. Water ice is thought to exist in the permanently shadowed parts of some craters at the south pole.

The rover will carry a drill able to reach about one meter beneath the lunar soil, spectrometers that analyze the chemical composition of surface materials, temperature and radiation sensors, and visible-light cameras. NASA's new radiation-tolerant High Performance Spaceflight Computing system, along with advanced autonomous navigation algorithms and sensors, will also be tested during the mission.

NASA plans to launch PROMISE in late 2028, and its mission on the surface will last 18 months. A $94 million base contract was signed with Blue Origin to land the vehicle at the south pole; a $140 million option may be added depending on the company's performance. Blue Origin will carry the rover with its Mark 1 lander. The new contract also expands the two lunar surface vehicle delivery missions awarded to the company in May 2026.

New task orders under VADR

NASA issued six more task orders for transporting equipment to the Moon. The agreements with Arrow Science and Technology, Blue Origin and Impulse Space under the Venture-Class Acquisition of Dedicated and Rideshare (VADR) program are worth about $1.3 billion in total. The missions are part of the 10-year VADR contract program, which has a total ceiling of $5 billion.

The new transport missions will use spacecraft called Orbital Transfer Vehicles (OTV), which can operate in orbits between Earth and the Moon. These vehicles will carry payloads to different orbits in space, while lunar landers will deliver the equipment to the surface.

Bora Haber previously reported: NASA unveils Promise lunar rover, set to launch to the Moon by end of 2028 and NASA Speeds Up Artemis Program, Prepares to Build a Moon Base.

Technology guides

Take a quiz, vote in a poll

Video news

Comments

Sign in to comment.

More on this topic

See all